Prefabricated Steel Structure Building——Workshop

Other Videos
January 09, 2026
Category Connection: Pre Engineered Building
Brief: Wondering how a galvanized PEB steel structure building compares to other options? In this video, we walk you through the complete assembly process of our prefabricated metal workshop, showcasing its lightweight design, durable components, and versatile applications for industrial and commercial use. See how our pre-engineered building system offers faster construction and optimized material usage.
Related Product Features:
  • Primary framing made from H-section steel columns and beams, hot-rolled or welded, with anti-rust paint or galvanization.
  • Secondary framing includes purlins and tie bars formed from C/Z section galvanized steel for structural support.
  • Bracing system with round steel pipes and angle steel enhances stability and durability of the entire structure.
  • Cladding options include color-coated corrugated steel sheets or sandwich panels for weather protection and aesthetics.
  • Customizable windows and doors available in plastic steel or aluminum-alloy, with sliding or folding designs.
  • Additional options like gutters, downpipes, ventilators, and bridge cranes can be fitted per client requirements.
  • Optimized frame geometry matches internal stress diagrams, reducing material usage and overall structure weight.
  • Suitable for various applications including single-span, multi-span, portal frame, and temporary structures.
FAQs:
  • How can I get a quotation for my steel structure building project?
    If you have a design drawing, we can provide a quotation based on it. If not, we will design drawings for your confirmation first and then offer the quotation.
  • Can you send engineers to assist with the installation of the structure?
    We provide detailed installation drawings and videos for free. Upon request, we can also send engineers to serve as installation directors on-site.
  • What is the typical lead time for receiving a pre-engineered steel building?
    Lead time varies but typically includes 2 weeks for drawings and 30-55 days for delivery, depending on the complexity of the project.
  • What are the payment terms for ordering a steel structure building?
    Our standard terms are 30% deposit paid in advance, with the balance paid before shipment. These terms can be negotiated based on specific project requirements.
Related Videos